ABOUT US     NEWS     CERTIFICATES     ARTICLES     MANUFACTURE     CONTACTS  
EN  |  RU
To check up a mail
Company News
Big5 2009, UAE, Dubai

3. Stockpiling



We will be glad to see you on exhibition ANGA Cable 2009, which will take place 26 - 28 May in Cologne Fair Grounds, Hall 10.2, stand K48, Cologne, Germany
  1. Always form pile from the casing elements of the same width.
    It is possible to put half-size elements in upper layers (see pic. 6). In this case, it is necessary that each element of casing is tied with at least two loops of transport hanger.

  2. During piling of casing elements, it is necessary to put two-sided cones between them (see pic. 7). Maximum height of the pile is 8 casing elements.
  3. Fasten the pile of casing elements with bands (see pic. 7).

  4. Stockpiling