ABOUT US     NEWS     CERTIFICATES     ARTICLES     MANUFACTURE     CONTACTS  
EN  |  RU
To check up a mail
Company News
Big5 2009, UAE, Dubai

Flooring formwork mounting procedure



We will be glad to see you on exhibition ANGA Cable 2009, which will take place 26 - 28 May in Cologne Fair Grounds, Hall 10.2, stand K48, Cologne, Germany


Step 1. Mount the supports into tripods and lock in as per
the horizontal formwork mounting layout



Step 2. Insert the lowering heads into supports.
Make sure the wedge is blocked properly.



Step 3. Insert the longitudinal formwork beams into lowering heads.



Step 4. Mount and fix the support heads;
then mount the intermediate props.



Step 5. Lay the transverse formwork beams and plywood

Caution!

  • Always observe the established safety and labour protection rules when employing our products.
  • The pictures presented in these manual present intermediate phases of the mounting procedure; therefore, the pictures may be incorrect in respect of safety protection.
  • Check the quality of materials before use. Any damaged, deformed, or worn (due to run-out, corrosion, or rotting) items shall be rejected.
  • Use the original spare parts only.
  • Combination of the “Variant” formwork systems and any other types may be dangerous, and requires additional testing.
  • In case any consultations are needed, we shall allocate a specialist to your construction site.